此语言仍有 26 条内容或界面任务待翻译;未完成部分显示中文原文。
可用量待供方确认Cloud instance (GPU virtualized instance, delivered via vGPU partitioning); also available as Taihang Elastic Bare Metal Servers, cloud servers, and other delivery forms

Baidu AI Cloud GPU Virtualized Cloud Servers: T4/V100 vGPU Compute Launched

百度智能云 · Baoding (Baidu self-built data center)

Content Correction
Reference unit priceProvided by SupplierPending Quote
单卡显存Provided by Supplier2GB

Configuration and Network

GPU
T4 和 V100 GPU 虚拟化云服务器(vGPU,1块物理卡可切分为 1/2、1/4、1/8、1/16 原显存)
Delivery method
Cloud instance (GPU virtualized instance, delivered via vGPU partitioning); also available as Taihang Elastic Bare Metal Servers, cloud servers, and other delivery forms
节点地区
Baoding (Baidu self-built data center)

Deployment and Delivery Instructions

At its Intelligent Computing Summit, Baidu AI Cloud launched GPU virtualized cloud servers, which partition vGPU from T4 and V100 physical cards with a minimum granularity of 1/16 of the original video memory (minimum 2GB VRAM), offered in compute-optimized and rendering-optimized variants: the former targets machine learning, deep learning, data science, and high-performance computing, while the latter supports graphics rendering and AR/VR. The same page also introduced Taihang Elastic Bare Metal Servers powered by Intel 6271 and cost-effective cloud server packages based on AMD EPYC 7502, as well as the Baoding self-built data center hosting over 360,000 high-performance AI servers. The page does not disclose unit pricing or rental terms; please confirm pricing and availability with the supplier before purchasing.

Activation Process

  1. 提交用途、配置、卡数与租期
  2. 与供方确认资源、网络和正式报价
  3. 签订服务约定并确认交付
  4. 验收环境、访问权限与服务指标

Compilation Notes 内容由 AI 根据公开资料整理;事实与推断分开呈现。

Content Correction
Product Selection Assistant

让需求变成可修改的筛选条件

依据已录入参数生成条件,结果可查看和修改。帧率与性能需核对实测,不能仅凭算力数值保证。