Announcement Highlights
Procurement Subject
This project involves the construction procurement of the intelligent mobile robot training laboratory at Shanghai Xingjian Vocational College, covering modules such as intelligent mobile swarm-controlled lifting robots, mobile swarm-controlled AMR charging piles, and supporting equipment, with a budget of 680000 CNY and 1 lots.
View Terms Summary
This project involves the construction procurement of the intelligent mobile robot training laboratory at Shanghai Xingjian Vocational College, covering modules such as intelligent mobile swarm-controlled lifting robots, mobile swarm-controlled AMR charging piles, and supporting equipment.
Delivery and Acceptance
All supply, installation, and commissioning must be completed within 30 days after contract signing; all work must be completed before 2026-11-30.
View Terms Summary
Project period: All supply, installation, and commissioning must be completed within 30 days after contract signing. All work must be completed before 2026-11-30.
Bid Format
Open tendering; consortium bids are not allowed for this project. When a branch of a legal entity participates in its own name, it must provide registration certification and written authorization from the legal entity; a legal entity and its branches may not participate simultaneously.
View Terms Summary
This procurement does not accept consortium participation in consultations.; Consortium bids are not allowed for this project.
Eligibility Requirements
Comply with Article 22 of the Government Procurement Law; possess a valid business license and the professional personnel, professional equipment, and professional technical capabilities necessary to perform the contract; implement domestic product support policies; bids (responses) for imported products are not accepted.
View Terms Summary
Comply with the provisions of Article 22 of the Government Procurement Law of the People's Republic of China, possess a valid business license, and have the professional personnel, professional equipment, and professional technical capabilities necessary to perform the contract
Eligibility Requirements (Related-Party Restrictions)
Suppliers whose legal representatives are the same person or who have direct controlling or management relationships may not participate in procurement under the same contract; suppliers that provided preliminary consulting services for the project may not participate in other procurement activities of this project.
View Terms Summary
Suppliers whose legal representatives are the same person or who have direct controlling or management relationships may not participate in procurement activities under the same contract
To Be Verified
Pending VerificationThe project number, procurement agency, technical parameter list, and scoring methodology are not listed in the current source and need to be verified against the official tender documents.
Editorial Analysis Inferred from source information
Judging from the announcement structure, this is a training laboratory construction procurement by a vocational college centered on intelligent mobile robot teaching scenarios. The subject matter includes swarm-controlled lifting robots, AMR charging piles, and supporting equipment, constituting a combined procurement of embodied intelligent robot units and supporting infrastructure. Two hard thresholds deserve suppliers' attention: first, only domestic products are allowed to participate and imported products will not be accepted for bidding, so foreign-funded agents or those mainly offering imported equipment cannot respond; second, consortium bidding is not accepted, so small and medium-sized integrators must independently possess delivery capability. The budget of 68 thousand yuan corresponds to 1 bid section(s). After deducting the charging piles and supporting equipment, the budget headroom for the robot units themselves is limited, so bidders need to balance module configuration when pricing. Delivery constraints are tight: supply, installation, and commissioning must be completed within 30 days after contract signing, and all work must be finished before 2026-11-30. If the contract is signed after bid opening in early 11, the supply chain lead time is the main risk point. The above analysis is inferred from the announcement text; specific technical parameters are subject to the formal bidding documents.
Compilation Notes 内容由 AI 根据公开资料整理;事实与推断分开呈现。
Content CorrectionPossible Matching Products
按品类匹配,参数需对照招标文件。