Announcement Highlights
Procurement Subject and Quantity
The School of Automation is procuring 4 multi-modal wheel-legged robots for the National Industrial Internet Industry-Education Integration Innovation Platform project, serving research experiments in multi-robot collaborative control and engineering training education.
View Terms Summary
The School of Automation is procuring 4 multi-modal wheel-legged robots, with the main technical requirements as follows: The National Industrial Internet Industry-Education Integration Innovation Platform project is committed to achieving deep synergy and innovation in integrated sensing-computing-control technologies in the industrial internet field
Technical Requirements
The robots must support three types of locomotion modes—dual point-foot, dual flat-foot, and dual wheel-foot—and be able to switch modes to adapt to flat ground, slopes, small drops, and complex semi-structured environments; detailed technical specifications are set out in the procurement documents.
View Terms Summary
Supports three types of locomotion modes—dual point-foot, dual flat-foot, and dual wheel-foot—and can adapt to flat ground, slopes, small drops, and complex semi-structured environments through mode switching, meeting the core use scenarios of outdoor inspection and simple operations
Bid Format Restrictions
Bids for imported products are not accepted; consortium bids are not accepted.
View Terms Summary
This project does not accept bids for imported products; detailed technical specifications are set out in the procurement documents.
Consortium Restrictions
Consortium bids are not accepted for this project.
View Terms Summary
This project ( does not accept ) consortium bids.
Delivery and Acceptance
Equipment installation and commissioning must be completed within 45 days after contract signing.
View Terms Summary
Contract performance period: equipment installation and commissioning must be completed within 45 days after contract signing.
Qualification Requirements
Suppliers must meet the requirements of Article 22 of the Government Procurement Law, including the capacity to independently bear civil liability, good business reputation and sound financial systems, the equipment and professional technical capability required to perform the contract, records of lawful tax payment and social insurance contributions, and no record of major legal violations in the past three years.
View Terms Summary
(1) Capacity to independently bear civil liability (a business license of a legal person or other organization must be provided; if the supplier is a natural person, their identity card must be provided);
Conflict of Interest Restrictions
Suppliers that have provided overall design, specification preparation, project management, supervision, inspection, or other services for this project may not participate in other procurement activities of this project.
View Terms Summary
Suppliers that have provided overall design, specification preparation, or project management, supervision, inspection, or other services for the procurement project may not participate in other procurement activities of that project
Budget and Price Cap
Both the budget amount and the maximum price cap are 80 万元 (RMB).
View Terms Summary
Budget amount: 80.000000 万元 (RMB) Maximum price cap (if any): 80.000000 万元 (RMB)
Editorial Analysis Inferred from source information
Based on the announcement, this procurement targets the teaching and research scenarios of the industry-education integration platform: the requirement for switching among three locomotion modes indicates that the buyer values the equipment's adaptability in complex semi-structured environments rather than the performance of a single configuration. The budget of 80 CNY corresponds to 4 units, or approximately 20 CNY per unit, pointing to a wheel-legged platform with a research-grade configuration; the exclusion of imported products means only domestically produced products are eligible. The delivery period of 45 days is tight, so suppliers need to confirm inventory availability or production scheduling capacity. The above is an inference based on the announcement text; the actual technical requirements are subject to the technical parameters in the procurement documents.
- The announcement does not disclose specific technical parameters, only noting that details are in the procurement documents, so indicators such as accuracy and payload cannot be verified;
- The source is a third-party bidding information repost website (China Sewage Treatment Engineering Network), not the buyer's official publication channel, and the original announcement prevails;
- The budget is the maximum price ceiling and does not equal the contract award price.
Possible Matching Products
按品类匹配,参数需对照招标文件。