Announcement Highlights
Procurement Subject
The procurement requirements cover storage servers, computing servers, all-flash disk array 1, and all-flash disk array 2, intended to expand the computing and storage capacity of the North China meteorological big data cloud platform.
View Terms Summary
5.Procurement requirements: storage servers, computing servers, all-flash disk array 1, all-flash disk array 2
Budget and Maximum Price Limit
Budget amount 562.35万元 (10,000 yuan); maximum price limit 562.35万元 (10,000 yuan).
View Terms Summary
3.Budget amount: 562.350000万元 4.Maximum price limit: 562.35万元
Delivery and Acceptance
Delivery within 30 days after contract signing; installation and commissioning completed and ready for acceptance within 60 days. The specific service start and end dates may be postponed accordingly based on the contract signing date.
View Terms Summary
6.Contract performance period: delivery within 30 days after contract signing; installation and commissioning completed and ready for acceptance within 60 days. (The specific service start and end dates may be postponed accordingly based on the contract signing date)
Bidding Format
Online bidding via the electronic procurement system (Guoecai); bid documents must be prepared with the bidding tool (new), encrypted, and uploaded. Consortium bids are not accepted.
View Terms Summary
This project adopts online bidding via the electronic procurement system (Guoecai). Eligible bidders must install the bidding tool (new), prepare their bid documents, and upload them encrypted.
Qualification Requirements
Must comply with Article 22 of the Government Procurement Law; no additional qualification requirements for implementing government procurement policies; no specific qualification requirements.
View Terms Summary
1. Comply with Article 22 of the Government Procurement Law of the People's Republic of China 2. Qualification requirements for implementing government procurement policies: None 3. Specific qualification requirements for this project: None
Pre-Bid Response Verification
A digital certificate and electronic signature must be obtained in advance and confirmed to be within their validity period. Bidding documents can be downloaded free of charge online from the Central Government Procurement website; no registration is required.
View Terms Summary
Suppliers bidding in this project must obtain a digital certificate and electronic signature in advance. For application procedures and precautions, please refer to the 'Registration Guide' section on the homepage of the Central Government Procurement website.
To Be Verified
Pending VerificationThe specific quantities and technical specifications of each device are not listed in the main text of the announcement and must be verified via the attachments of the procurement documents.
View Terms Summary
Attachment 1 Beijing Meteorological Data Center North China Regional Meteorological Big Data Cloud Platform Support Computing Power and Storage Expansion Procurement Project Procurement Document.pdf
Editorial Analysis Inferred from source information
This project involves computing power and storage infrastructure expansion for meteorological nowcasting scenarios, procuring four categories of equipment (storage/computing servers and two types of all-flash disk arrays), which can be inferred as a hybrid deployment of parallel computing and storage expansion; it is hosted by the Central Government Procurement Center and follows the Guoecai electronic bidding process. Prospective bidders need to obtain digital certificates and electronic signatures in advance and monitor their validity periods. The bid preparation period runs roughly from the document acquisition period to the bid opening on 11 16, a window of about three weeks. The budget of 562.35 ten thousand yuan is also the ceiling price; bids exceeding this amount may be rejected. It is recommended to verify this point in the procurement documents before bidding.
- The announcement body does not list specific quantities or detailed technical specifications for each piece of equipment; please download the procurement document PDF to verify.
- Qualification requirements only reference Article 22 of the Government Procurement Law; no specific qualifications are required, but this does not mean there are no technical scoring items during bid evaluation.
- The delivery period may be extended depending on the contract signing date; actual start and end dates are subject to the contract.
- This analysis is based on the announcement page text; the full content of the procurement document attachments has not been verified.
Possible Matching Products