Announcement Highlights
Procurement Scope and Package Division
The project is divided into 5 packages, covering procurement and installation of monitoring station infrastructure and integrated pressure-type water level and temperature gauges (including RTU) in 15 prefecture-level cities (demonstration zones); Package 4 also includes hyper-converged cluster computing power expansion for the provincial-managed platform.
View Terms Summary
Package 1: Procurement and installation of monitoring station infrastructure and corresponding integrated pressure-type water level and temperature gauges (including RTU) in Anyang, Hebi, Puyang, and Jiyuan Demonstration Zone 5597600.00 322000.00 / 5919600.00
Correction of Maximum Price Ceilings by Sub-item
The detailed table of maximum price ceilings by sub-item in Attachment 1 of Chapter 7 (Bid Evaluation Method — Comprehensive Scoring Method) of the bidding documents is changed to the new price ceilings for 5 packages, all tax inclusive.
View Terms Summary
In the bidding documents, “Chapter 7: Bid Evaluation Method (Comprehensive Scoring Method), Attachment 1: Detailed Table of Maximum Price Ceilings by Sub-item” is changed to
Change of Document Retrieval Time
The document retrieval deadline is changed to 2026-11-17 23:59 (Beijing Time).
View Terms Summary
The document retrieval deadline is changed to: 2026-11-17 23:59 (Beijing Time)
Bid Opening Time
The bid opening time is 2026-12-01 09:00 (Beijing Time), consistent with the bid document submission deadline.
View Terms Summary
Original bid opening time: 2026-12-01 09:00 (Beijing Time) Bid opening time changed to: 2026-12-01 09:00 (Beijing Time)
Clarification Document Requirements
For all other details, refer to the latest clarification document, which bidders must download promptly.
View Terms Summary
For all other details, refer to the latest clarification document. Please download the clarification document promptly.
Eligibility Requirements
Pending VerificationThis correction announcement does not list bidder eligibility requirements; refer to the clarification document and the original bidding documents.
View Terms Summary
Item corrected: Procurement documents
Bid Format
Pending VerificationThis correction announcement does not specify the bidding method or whether consortia are permitted; refer to the clarification document and the original bidding documents.
View Terms Summary
Original bid submission deadline (deadline for submission of bid documents): 2026:12 on 01 09, 00 (Beijing Time)
Editorial Analysis Inferred from source information
This announcement is a correction announcement to the procurement documents rather than a new tender: the core changes are the detailed table of sub-item maximum price caps and the deadline for obtaining the documents, while the bid opening time remains unchanged. The practical impact on bidders focuses on two points: first, bidders need to re-verify their pricing structure against the corrected sub-item price caps (especially the newly added computing power expansion cap of 431,000 yuan for the provincially managed platform's hyper-converged cluster in Lot 4, a sub-item open to computing power and server suppliers); second, the document acquisition window closes at 2026:11 on 17 23, 59, leaving limited response time for potential bidders who have not yet obtained the documents. Lot 4 is the only lot that includes computing power expansion; suppliers with only computing power integration capabilities but without water level monitoring facility installation capabilities should assess the feasibility of responding—the announcement does not state whether consortia are permitted, which is an inferred limitation.
- This is a correction announcement that does not list bidder qualification requirements, delivery timelines, or bidding methods; these must be reviewed in the clarification documents and the original bidding documents (basis: the announcement contains only correction information; the original text states "For other details, see the latest clarification documents; please download the clarification documents promptly.")
- The total amounts for each lot are taken from the announcement's "Total Maximum Price Cap" column, but the total project value is not directly stated in the announcement
- In the bid opening time change section, the changed time is identical to the original time (both 2026:12 on 01 09, 00); this is as stated in the original announcement, and whether it is a typo remains to be verified
- Whether consortium bidding is permitted and the qualification requirements for each lot are unconfirmed